One storey administrative modular and household complex with an area of 374 m2 built on the basis of nine office modules, each measuring 2.9 * 3.0 * 13.8 m.

The complex is located on the bank of the Portovaya Bay, near the border of Finland, where work is underway on the construction of gas pipeline.

In addition it was made and delivered to an object the guard post - block container with panoramic windows.

All rooms are equipped with of the complex embedded air conditioning of inverter type and fire alarm system.

In building is installed autonomous system of water supply on the basis of two tanks with a capacity of 5,000 and 2,000 liters, water pumping station and the electric boiler. Additionally, for the control of regime object are made two separate modules for accommodation security staff. Modules of Guard have a large glass area for a better overview of the area. Term of manufacturing and installation: 26 days.